New Build Electrical Installations Cardiff
New build electrical installations delivered to programme, first fix, second fix and certification ready for the building control file.

New Build Electrical Installations In Cardiff
On Programme, Certificated For Handover
We work to build programmes rather than around them, because an electrician who misses a first fix date holds up every trade behind them. Working from scratch also means the installation is designed for how the property will actually be used, with provision left for anything the client may want later.
Our new build electrical services include:
- Full first fix and second fix installations
- Consumer unit and distribution design
- Lighting design and LED installation
- Provision for EV chargers and solar
- Data, TV and network cabling
- Interlinked smoke and heat detection
- Underfloor heating supplies and controls
- External and garden supplies
- Testing, certification and Part P notification
- Extensions, conversions and loft rooms
Handover comes with full test results and certification, documented rather than assembled afterwards.
Have A New Build Or Conversion Coming Up?
A single extension or a multi plot development, no job is too big or too small for our electricians.
New Build Work Across Cardiff & Nearby
Cardiff based, so we can attend site at short notice when the programme moves.
We work on new builds, extensions and conversions across the whole city and out into the Vale.
Extensions on older property are the harder job, because the new work has to tie into whatever is already there.
Our Accreditations
- NICEIC Registered
- Part P Compliant
- BS 7671 18th Edition
- Safecontractor Member
- MCS Accredited
- RECC Member
- CHAS Member
- OZEV Approved Charge Point Installer
- Trustmark Member
- Fully Insured
First Fix & Second Fix
Hitting The Programme
First fix is everything that has to be in before the walls and ceilings close. Cable runs, back boxes, containment, the position of every accessory. Once plasterboard goes on, changing any of it means cutting it out again.
That is why the planning conversation happens before we start rather than during. Socket and switch positions against the actual furniture layout, where the board is going, and provision for anything the client may want later. Running a spare route for an EV charger or a garden supply at first fix costs very little. Retrofitting it once the house is decorated costs a great deal.
Second fix is accessories, fittings, the board and commissioning, and it has to land after decoration but before handover. We plan it into the programme with the site manager rather than being chased for it.
Testing and certification then follow, with everything documented for the building control file rather than assembled afterwards.
Extensions, Conversions & Loft Rooms
Tying New Work Into An Old Installation
Most of our new work in Cardiff is not a new house, it is an extension, a loft conversion or a terrace being split into flats. Those are harder than a new build in one specific way, because the new installation has to tie into whatever is already there.
The first question is always whether the existing board and supply can carry the addition. A loft conversion adds circuits, a rear extension usually moves the kitchen, and a flat conversion needs separate distribution per unit. Plenty of older boards have no spare capacity, so a board replacement comes first.
The second is whether the existing installation is sound enough to extend. There is no sense connecting new circuits to wiring that is at the end of its life, and testing the existing installation before designing the new work avoids that.
Where the answer is that the whole thing needs doing, we will say so early enough for it to be budgeted rather than discovered halfway through.
Frequently Asked Questions
Our New Build Electrical FAQs
Do you work to a build programme?
Yes. First fix before plasterboard and second fix after decoration, planned with the site manager rather than fitted in whenever. Holding up the trades behind us is not an option.
Can you provide for an EV charger or solar later?
Yes, and doing it at first fix costs very little. Running the route and leaving spare capacity in the board is far cheaper than retrofitting once the house is finished.
Will an extension need a new fuse board?
Often. An extension or loft conversion adds circuits and plenty of older boards have no spare ways or adequate protection. We test what is there before designing the new work.
What certification do we get at handover?
Full test results and an Electrical Installation Certificate, with the work notified under Part P, all documented for the building control file.